6 framework registers · 155 pre-populated risks · every row scored on a 5×5 inherent + residual matrix and mapped to a specific clause (Annex A, TSC CC1–CC9, §164.308–§164.312, GDPR Articles 5–44, PCI DSS 4.0.1 12.3.1 TRA, CSF 2.0). Drop into your ISMS — keep the rows that fit, edit the rest.
Once your register is in place, run a free 60-second ComplianceIQ audit on your existing policies and we'll score every control gap against the framework — no signup required.
Run a free audit